– Supplying spare part for DeLaval steam turbine:

* Supplying Trip and Throttle (T&T) valve

* Employer: Lavan Oil Refinery Co.

* Start date: 4/20th/2019

* Finish date: 7/21st/2020

– Development and valence stabilization of Abadan Refinery:

* Construction and assembling of non-industrial pre-fabricated metal buildings

* Executing the operation of ceiling and frame (body) coverage; electrical, precision instruments, civil executive and pre-fab metal buildings landscaping activities.

* Employer: Oil Design and Construction Co. (ODCC)

* Start date: 4/30th/2019

* Finish date: 10/21st/2020

– Strengthening and renovating Unit 600 at Abadan Petrochemical Co.:

* Presenting the plan of strengthening; replacing and reconstructing metal structures, removing the rust, painting, and insulating.

* Employer: Abadan Petrochemical Co.

* Start date: 5/22nd/2019

* Finish date:  2/9th/2020

– Reconstruction of Unit 600 at Abadan Petrochemical Co.:

* Executing the operation of removing the rust, painting, supplying, and insulating equipment operations, supplying the materials and executing fireproof coverage for structures and frame (body) of the equipment.

* Employer: Abadan Petrochemical Co.

* Start date: 7/20th/2019

* Finish date: 5/20th/2020

– Pre-installation and installation of Unit 600 at Abadan Petrochemical Co.:

* Human resource supply to manage on pre-installation and installation of unit 600 and documentation on the basis of OPERCOM® methodology

* Employer: Abadan Petrochemical Co.

* Start date: 3/18th/2020

* Finish date: 6/20th/2020

– Executing the operations removing the insulations, sandblasting, and painting the towers:

* Executing the operations removing the rust, painting, supplying and insulation of the equipment.

* Employer: Abadan Petrochemical Co.

* Start date: 1/21st/2020

* Finish date: 3/18th/2020

– South Pars gas field development plan phases 22, 23, and 24:* Employers: Petro Saze Mobin Co. and Pars Oil & Gas Co.* Finish date: 3/20th/2019

* Start date: 9/4th/2018

* Contract management on constructing unit 102 and train 4 of the gas field

– South Pars gas field development plan phases 20 – 21:

* Executing all remained operations and activities in all regions of the site, including civil, piping, structural, mechanical, painting, insulation, and etc.

* Employer: Oil Industries Engineering & Construction Group (OIEC Group)

* Start date: 5/10th/2017

* Finish date: 7/6th/2018

تاریخ پایان: ۱۵/۰۴/۱۳۹۷

– Executing activities related to phases 17 – 18 overhauls

Including mechanical and piping activities in overhaul period

* Employer: South Pars Gas Co.

* Start date: 9/25th/2017

* Finish date: 10/22nd/2017

– South Pars gas field development plan phases 20 – 21:

* Performing operational activities and total reconstruction of gas sweetening unit after the fire

* Dismantling

* Supplying some of the project merchandise including piping materials (pipes, fittings, flanges, valves, etc.) precision instruments, cables, chemical materials (including pearlite and activated carbon), different kinds of nuts and bolts, structure parts and etc.

* Supplying merchandises, performing reforms, repairs, construction and re-installation of the unit.

* Employer: Oil Industries Engineering & Construction Group (OIEC Group)

* Start date: 1/9th/2017

* Finish date: 5/21st/2017

– South Pars gas field development plan phases 20 – 21:

Performing all TFT human resource supply operational activities due to completion tracking

Employer: Oil Industries Engineering & Construction Group (OIEC Group)

Start date: 9/5th/2016

Finish date: 5/9th/2017

– South Pars gas field development plan phases 20 – 21:

Civil and mechanical operations in unit OSBL

Employer: Oil Industries Engineering & Construction Group (OIEC Group)

Start date: 8/1st/2016

Finish date: 8/22nd/2017